National Archives catalogue number WO 170/521.
Abbreviation
|
3T Arr Arrgts Bde Equip GS Lt NTR Off OR Refts REME Tpt |
3 Tonner Arrive Arrangements Brigade Equipment General Stores Light Nothing to Report Officer Other Ranks Reinforcements Royal Electrical and Mechanical Engineers Transport |
Month and year : August 1944
Commanding Officer : Capt R.H. Watson
1st to 3rd August 1944
Place: Rome area
Routine. NTR.
4th August 1944
Place: Rome area
Visit to REME Branch AA1 Rome. Permission to retain refts converting W/Shops to be suitable for lt Bde rôle given. Two maintenance parties sent to airfields during practice jumps.
5th to 8th August 1944
Place: Rome area
Work expedited to fully mobilise "Light Bde" tpt. & Bde equip. for operation.
9th to 10th August 1944
Place: Rome area
Also W/Shop element for Seaborne part prepared.
11th August 1944
Place: Rome area
W/Shop element consisting of 4 stores lorries, 1 3T GS, 2 3T B/N 11 Jeeps & trailers + 1 off & 43 ORs left for embarkation concentration area near Lake PATRIA near NAPLES. Arr. this area via Route 7 without incident at 1900 hrs. Base element of 12 ORs under charge S/Sgt DARTER left near ROME to carry out maintenance & inspection of Base element equip.
12th to 20th August 1944
Place: Naples area
Tpt & personnel spread over 4 vessels in accordance with American staff instructions tpt & parties despatched to embarkation areas. Operation so far as Seaborne element concerned cancelled 20 Aug. Breakdown lorry & 2 NCOs embarked before cancellation of orders & will presumably proceed to S. FRANCE before being returned.
21st August 1944
Place: Napes area
Return from NAPLES AREA under unit arrgts to BASE location area nr. ROME. Rear party of 6 ORs under Sgt GWYTHER left in Bde TRANSIT camp NR. NAPLES to maintenance of Bde convoys travelling between NAPLES & ROME when AIRBOURNE Element returns.
22nd to 23rd August 1944
Place: Rome area
Re-establishment of camp & W/Shop in previous location. Full maintenance on unit tpt.
24th August 1944
Place: Rome area
Routine. Limited amount of work only. Large no. of containers being serviced.
25th to 27th August 1944
Place: Rome area
Routine. Work building up on tpt left at Base. Servicing party from transit area rejoined main body.
28th to 31st August 1944
Place: Rome area
Orders received that Bde equipment to be ready operationally in 7 days. Men put on to 12 hr working day. Large unit work particularly on containers.